Abstract
The construction of grounding mesh has procedures fundamental to start with continuity, these procedures must have technical accidents, inefficient designs and non-observance of safety rules, affecting the integrity of the worker and equipment to protect, time will relate the application of ethics in professional practice for the design of a system to land having as its main objective to safeguard the integrity of the workers any person who is a grounding system.
Translated title of the contribution | Deontology Applied in Design and Construction of Grounding Meshes |
---|---|
Original language | Spanish (Ecuador) |
Pages (from-to) | 1-7 |
Number of pages | 7 |
Journal | Observatorio De La Economía Latinoamericana |
Volume | 2018 |
Issue number | 2018 |
State | Published - 27 Sep 2018 |
Keywords
- Touch Voltage
- Gpr
- System Grounding
- Step Voltage
CACES Knowledge Areas
- 237A Construction and civil engineering