Transmission Expansion Planning Considering Grid Topology Changes and N-1 Contingencies Criteria

Diego Carrión, José Palacios, Manuel Espinel, Jorge W. González

Producción científica: Capítulo del libro/informe/acta de congresoContribución de conferenciarevisión exhaustiva

6 Citas (Scopus)

Resumen

In the present research, a new methodology is proposed to find the solution to the problem of transmission expansion planning in electrical power systems, considering changes in topology through the optimal transmission switching, N–1 contingencies and maximum chargeability of the lines; the proposed model considers optimal power flows DC to minimize operating and investment costs. In addition to this, the restriction of the problem is posed by not allowing demand rationing. The proposed methodology is applied in the IEEE 14-bus system in which several case studies were proposed, varying the maximum number of transmission lines that can be switched and as a result, the new lines that must be implemented in the SEP are obtained in a time of 5 years. The behavior of the power flows circulating through the transmission lines before and after the exposed methodology is also compared.

Idioma originalInglés
Título de la publicación alojadaRecent Advances in Electrical Engineering, Electronics and Energy - Proceedings of the CIT 2020
EditoresMiguel Botto Tobar, Henry Cruz, Angela Díaz Cadena
EditorialSpringer Science and Business Media Deutschland GmbH
Páginas266-279
Número de páginas14
ISBN (versión impresa)9783030722074
DOI
EstadoPublicada - 2021
Evento15th Multidisciplinary International Congress on Science and Technology, CIT 2020 - Quito, Ecuador
Duración: 26 oct. 202030 oct. 2020

Serie de la publicación

NombreLecture Notes in Electrical Engineering
Volumen762 LNEE
ISSN (versión impresa)1876-1100
ISSN (versión digital)1876-1119

Conferencia

Conferencia15th Multidisciplinary International Congress on Science and Technology, CIT 2020
País/TerritorioEcuador
CiudadQuito
Período26/10/2030/10/20

Nota bibliográfica

Publisher Copyright:
© 2021, The Author(s), under exclusive license to Springer Nature Switzerland AG.

Huella

Profundice en los temas de investigación de 'Transmission Expansion Planning Considering Grid Topology Changes and N-1 Contingencies Criteria'. En conjunto forman una huella única.

Citar esto