Ir directamente a la navegación principal Ir directamente a la búsqueda Ir directamente al contenido principal

Planning Scheme for Optimal PMU Location Considering Power System Expansion

Producción científica: Contribución a una revistaArtículorevisión exhaustiva

Resumen

In the present research, a methodology was developed for the deployment and optimal location of PMUs with redundancy and system observability constraints at 100%, considering the topological changes generated by transmission expansion planning (TEP). To determine the expansion scenarios and topology changes of the power system, the original IEEE test systems of 14, 30, and 118 buses were used as a starting point, in which a 20-year horizon was considered and an increase in load nodes was proposed, with which the new lines needed were determined by applying TEP. Under these temporal and expansion scenarios, the optimal location of PMUs was determined based on mixed-integer linear optimization, with which the order of location of PMUs was determined. The results of the methodology allow defining the order of PMU implementation in power systems that expand over time.

Idioma originalInglés
Número de artículo3283
PublicaciónEnergies
Volumen18
N.º13
DOI
EstadoPublicada - jul. 2025

Nota bibliográfica

Publisher Copyright:
© 2025 by the authors.

ODS de las Naciones Unidas

Este resultado contribuye a los siguientes Objetivos de Desarrollo Sostenible

  1. ODS 7: Energía asequible y no contaminante
    ODS 7: Energía asequible y no contaminante

Areas de Conocimiento del CACES

  • 317A Electricidad y energía

Huella

Profundice en los temas de investigación de 'Planning Scheme for Optimal PMU Location Considering Power System Expansion'. En conjunto forman una huella única.

Citar esto