Resumen
Determining the location of capacitor banks in an urban or rural distribution network represents benefits for the distribution company by providing improvements in the power factor, the reduction of reagents in the network and the decrease in voltage drops. A two-phase heuristic method has been used to carry out the study in a distribution feeder of the urban-rural type, and thus to finding an optimal solution location of the fixed and variable capacitor banks with very favorable results for the system.
Idioma original | Inglés |
---|---|
Título de la publicación alojada | IEEE CHILEAN Conference on Electrical, Electronics Engineering, Information and Communication Technologies, CHILECON 2019 |
Editorial | Institute of Electrical and Electronics Engineers Inc. |
ISBN (versión digital) | 9781728131856 |
DOI | |
Estado | Publicada - nov. 2019 |
Evento | 2019 IEEE CHILEAN Conference on Electrical, Electronics Engineering, Information and Communication Technologies, CHILECON 2019 - Valparaiso, Chile Duración: 13 nov. 2019 → 27 nov. 2019 |
Serie de la publicación
Nombre | IEEE CHILEAN Conference on Electrical, Electronics Engineering, Information and Communication Technologies, CHILECON 2019 |
---|
Conferencia
Conferencia | 2019 IEEE CHILEAN Conference on Electrical, Electronics Engineering, Information and Communication Technologies, CHILECON 2019 |
---|---|
País/Territorio | Chile |
Ciudad | Valparaiso |
Período | 13/11/19 → 27/11/19 |
Nota bibliográfica
Publisher Copyright:© 2019 IEEE.