Ir directamente a la navegación principal Ir directamente a la búsqueda Ir directamente al contenido principal

Apparent delay analysis for a flat-plate solar field model designed for control purposes

  • Gary Ampuño
  • , Lidia Roca
  • , Juan D. Gil
  • , Manuel Berenguel
  • , Julio E. Normey-Rico

Producción científica: Contribución a una revistaArtículorevisión exhaustiva

Resumen

This study presents an analysis of the effect of the transport delay which occurs in solar flat-plate collector fields and how to include its behavior in dynamic models suitable for control purposes. This investigation has been carried out using simplified models based on dynamic energy balances and models based on step response methods and experimental tests. The solar flat-plate collector field encompasses parallel absorber pipes intertwined with pipelines which act as several first-order plus dead time systems in parallel. The effect is an apparent delay observed at the outlet temperature that must be included in the dynamic model in order to reduce the error between the real measurement and the model prediction. The main contribution of this paper is the procedure to evaluate the apparent delay to obtain adequate dynamic models aimed to be used for control purposes.

Idioma originalInglés
Páginas (desde-hasta)241-254
Número de páginas14
PublicaciónSolar Energy
Volumen177
DOI
EstadoPublicada - 1 ene 2019

Nota bibliográfica

Publisher Copyright:
© 2018 Elsevier Ltd

ODS de las Naciones Unidas

Este resultado contribuye a los siguientes Objetivos de Desarrollo Sostenible

  1. ODS 7: Energía asequible y no contaminante
    ODS 7: Energía asequible y no contaminante

Citar esto