Abstract
In order to deploy an Electrical Energy Advanced Metering Infrastructure (AMI), Electrical Enterprises traditionally have to rent the infrastructure of a primary Mobile Network Operator (MNO). This paper presents a model for optimizing the Mobile Virtual Network Operator (MVNO) infrastructure employed for the communication between the Central Office with the Smart Meters (SM). It is proposed a model which minimizes the cost of the primary network operator infrastructure and reduces the expenses of the secondary network operator while saves and facilitates the spectrum utilization. The algorithm employed in the optimization model searches the best scenario for the SM clustering with purpose of minimizing the distance among Cellular Base Stations. In this paper the Smart Meters (SM) are considered fixed data terminals placed in Neighborhood Area Networks (NAN) covered by the mobile communications network.
| Original language | English |
|---|---|
| Title of host publication | 2015 IEEE Colombian Conference on Communications and Computing, COLCOM 2015 - Conference Proceedings |
| Editors | Yuli Andrea Rodriguez P |
| Publisher | Institute of Electrical and Electronics Engineers Inc. |
| ISBN (Electronic) | 9781479988341 |
| DOIs | |
| State | Published - 7 Jul 2015 |
| Event | 2015 IEEE Colombian Conference on Communications and Computing, COLCOM 2015 - Popayan, Colombia Duration: 13 May 2015 → 15 May 2015 |
Publication series
| Name | 2015 IEEE Colombian Conference on Communications and Computing, COLCOM 2015 - Conference Proceedings |
|---|
Conference
| Conference | 2015 IEEE Colombian Conference on Communications and Computing, COLCOM 2015 |
|---|---|
| Country/Territory | Colombia |
| City | Popayan |
| Period | 13/05/15 → 15/05/15 |
Bibliographical note
Publisher Copyright:© 2015 IEEE.
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- advanced metering infrastructure
- cellular networks
- clustering
- mobile virtual network operator
- optimization
- smart grids
Fingerprint
Dive into the research topics of 'Shortest path for optimal routing on Advanced Metering Infrastructure using cellular networks'. Together they form a unique fingerprint.Projects
- 1 Finished
-
Planning and Sizing for Optimal Deployment of the Automation, Control, and Communication System in Smart Grid
Inga Ortega, E. M. (PI), Masache Almeida, P. A. (Student), Suarez Pozo, C. G. (Student), Ganan Gainza, C. X. (Student) & Haro Vaca, J. R. (Student)
22/01/15 → 30/12/15
Project: Research and Development
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver