Abstract
In this document, the variation of temperature and radiation in a 100 kW photovoltaic assembly is connected to a 25 kV network through a DC-DC booster converter and a three-phase three-phase voltage source converter (VSC). Maximum power point tracking (MPPT) is implemented in the elevator converter using a Simulink® model that uses the technique of 'Incremental Conductance + Integral Regulator'. The switching duty cycle is optimized by an MPPT controller that uses the technique of 'Incremental Conductance + Integral Regulator'. This MPPT system automatically modifies the duty cycle to generate the voltage required to extract the maximum power.
| Translated title of the contribution | Radiation and Duty Cycle Estimates Using Maximum Load Transfer Point for the Optimization of a 100kva Photovoltaic System |
|---|---|
| Original language | Spanish (Ecuador) |
| Pages (from-to) | 1-12 |
| Number of pages | 12 |
| Journal | Visión Electrónica |
| Volume | 14 |
| Issue number | 14 |
| DOIs | |
| State | Published - 31 Jul 2020 |
Keywords
- Duty cycle
- Mppt
- Photovoltaic
- Power
- Radiation
- Temperature
CACES Knowledge Areas
- 317A Electricity and Energy
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver