Implementation of SCADA for IEC 61850 communication in the IEEE 14-Bus System

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

The article presents the implementation of the IEC 61850 protocol in a SCADA applied to the IEEE 14-bus system in the protection laboratory of the Salesiana Polytechnic University. The system encompasses overcurrent and distance IEDs, which are interconnected through a switch to an RTU. Using an Omicron CMC356 test equipment, fault currents and voltages are injected to validate GOOSE communication between IEDs, and a low voltage contactor is also used to validate the circuit breaker fault. The MMS and Sampled Values communication is validated between each IED and presenting the different variables on the designed SCADA screens. The methodology presented serves as a guide to validate protection and communication tests in substations under the IEC 61850 protocol.

Original languageEnglish
Title of host publicationProceedings - 2024 IEEE 6th Global Power, Energy and Communication Conference, GPECOM 2024
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages577-583
Number of pages7
ISBN (Electronic)9798350351088
ISBN (Print)9798350351088
DOIs
StatePublished - 2024
Event6th IEEE Global Power, Energy and Communication Conference, GPECOM 2024 - Budapest, Hungary
Duration: 4 Jun 20247 Jun 2024

Publication series

NameProceedings - 2024 IEEE 6th Global Power, Energy and Communication Conference, GPECOM 2024

Conference

Conference6th IEEE Global Power, Energy and Communication Conference, GPECOM 2024
Country/TerritoryHungary
CityBudapest
Period4/06/247/06/24

Bibliographical note

Publisher Copyright:
© 2024 IEEE.

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Keywords

  • GOOSE
  • IEC61850
  • IED
  • MMS
  • SV