Dispatching Scheduling and Operations Strategy with high capacity of Hydro Generation

  • DIego Arias Cazco
  • , Santiago Espinosa

Research output: Contribution to journalArticlepeer-review

Abstract

In this work, a methodology and operational strategy for the Dispatching Scheduling is proposed when available Spillage in the reservoirs system by excess hydroelectricity over demand. Prior-dispatching information is used for decision making for and obtain a modified dispatching. The methodology distribute excess energy, based on the decrease in power of all generators except central in spillage and ENRC, using a Participation Factor (FP) based on an assessment of the power delivered generation units. Participation Factor decreases the generation dispatch at each plant that is not in spillage, based on an apportionment of the powers dispensed at each plant and excess power obtained from the pre-dispatch. The FP has a binary variable with a value of 0 for the plants in shedding not involved in the apportionment, and 1 for participating. Applying the proposed participation factor is able to reduce power delivered and distribute excess power hours, maintaining an economic dispatch. Operational strategies are defined in the short term for dispatch the next day with feedback from the weekly schedule.

Original languageEnglish
Article number8015050
Pages (from-to)1664-1670
Number of pages7
JournalIeee Latin America Transactions
Volume15
Issue number9
DOIs
StatePublished - 2017

Bibliographical note

Publisher Copyright:
© 2017 IEEE.

Keywords

  • dispatching
  • excess hydroelectricity
  • Operational Strategy
  • Participation Factor
  • Reduction of Spillage
  • Scheduling
  • Spillage Dam
  • Spillage reservoir