Simulador de Lluvia para Ensayos de Aislantes Eléctricos en el Laboratorio de Alta Tensión de la Upscuenca

Project Details

Description

General objective Design and build a rain simulator according to the standards established for testing electrical insulators for the dimensions of the UPS-Cuenca high-voltage laboratory.
StatusFinished
Effective start/end date23/11/1723/11/18

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.