Project Details
Description
General objective
Calibrate and validate the F-Chart model to determine the performance of ST vacuum tube and flat plate collectors, considering typical arrangements (inclinations and orientations) for architectural integration in Andean sequatorial climates and determine the feasibility of adopting this technology in the city of Cuenca. .
Status | Finished |
---|---|
Effective start/end date | 26/09/19 → 26/09/21 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.